Partek

Partek is currently undertaking a 2 stage project at St Joseph’s School in Hindmarsh, which involves infilling an existing single storey building, and extending and connecting both stories to an adjacent existing double-storey building.

The large timber feature ceiling and various innovative flooring and wall types will result in a creative new space for the school. Various types of cladding systems and brickwork, will help the new build seamlessly incorporate itself into the existing buildings, maintaining the look and feel of the school.

The Loreto College Old Scholars Science Centre project comprises of the refurbishment of the existing science department including the addition of new & improved laboratories, informal learning areas and outdoor learning spaces.

Features include exposed concrete ceilings & services above, with a display of various ceiling & wall linings throughout that complement the joinery & workstations to each classroom. New full height glazing to the corridors and external walls creates a more open plan and bright learning environment maximising the existing space which connects with the new outdoor courtyards with teared concrete learning platforms under a curved shade sail structure.

After successfully tendering for the Mount Carmel College project, Partek have recently commenced construction onsite. The project includes a refurbishment to an existing building, the construction of a new two storey building and a major fire services infrastructure upgrade. The new two storey building is a Senior Learning Centre which is sited between two existing Buildings and a covered outdoor learning area. Construction of these works will be undertaken whilst the college remains fully operational. The SLC has five GLA’s, large interactive areas, staff rooms, an art room and a new canteen. Partek look forward to delivering another successful project for the college.

Partek have recently commenced the construction of the new head office for the Corporate Health Group which will be located at 103 Henley Beach Road, Mile End.

The new building comprises of a basement carpark and a further 2 storeys which will contain multiple reception and waiting areas, consult and treatment rooms and wet areas along with the administration headquarters which includes training rooms, executive offices, boardroom, case conference rooms etc. It will also include a hydrotherapy pool and rehabilitation gym located on the ground level.

A vast array of materials & finishes will be utilised throughout the build in particular the external facades which will feature Alucobond, perforated aluminium screening, rendered panelling, precast walls, stone veneer and extensive amounts of glazing.

In collaboration once again with Brown Falconer and Accord Property, Partek have recently commenced a new exciting project which involves the refurbishment of an existing building and construction of a new supported residential care facility known as “The Gums” at 47 Burton Road in Salisbury.

The Gums will provide supported accommodation for residents, as well as common areas and back of house services including a hydrotherapy pool, laundry, kitchen, toilets and staff amenity areas.

The project also involves external works including carports, car parking, signage, fencing, paving, undercover areas and full landscape delivery.

Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek