Partek

West Beach Parks Aquatic Facility

This redevelopment of the existing aquatic facility for West Beach Parks (formerly known as Adelaide Shores) involves the construction of a new 25m long by 10m wide main swimming pool with dual water slides/play equipment. Surrounding the pool area is an exposed aggregate concrete concourse, timber deck area as well as associated pool plant room, fencing and site works.  This will be the second pool project that Partek has completed for West Beach Parks, the first one being in 2015.

Client

West Beach Parks

Architect

Studio Nine Architects

Previous

Previous

Next

Next

CHG Development Mile End

Architect: Edge Architects

Partek

Mount Carmel College

Architect: Edge Architects

Partek

West Beach Parks Aquatic Facility

Architect: Studio Nine Architects

Partek

Heathfield High School

Architect: DesignInc

Partek

SA Care ‘The Gums’ Salisbury

Architect: Brown Falconer

Partek

Salvation Army Gawler

Architect: Hodgkison Architects

Partek

Moore Stephens Fitout Adelaide

Architect: Design Inc.

Partek

Redarc Expansion Stage 1 Works

Architect: Christopher Parker Architects

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek