Partek

The Salvation Army Worship Centre – Stage 2

After completing the $1m extension to the Salvation Army’s Worship Centre at Ingle Farm earlier in 2012, Partek Construction & Interiors have recently completed work on the $3.5m second phase of the project which involved a new two storey extension (approximately 1200 sqm) to the existing building, internal modifications to the existing building along with a 72 space car park and associated landscaping.

The new building addition is a precast & steel structure with a metal roof, clad with CFC & Aluminium & performance glazing. The internal fitout includes a new theatre, commercial kitchen, meeting rooms and office spaces.

Client

The Salvation Army

Architect

Hodgkison Architects

Location

Ingle Farm

Project Type

General Construction

Download case study
Previous

Previous

Next

Next

MyBudget Office Fit Out, Frome Street

Architect: Hodgkison

Partek

Star of the Sea School

Architect: Edge Architects

Partek

Salisbury Childcare & ELC (Confident Kids)

Architect: Flightpath Architects

Partek

Corporate Health Group- New Head Office & Health Facility

Architect: Edge Architects

Partek

CARA Head Office Fit Out (South Australian Disability Service Provider)

Architect: DesignInc

Partek

Senex Energy Office Fit Out

Architect: IA Design

Partek

Northpoint Toyota Prospect

Architect: Tesseract International

Partek

West Beach Parks Resort, Aquatic Facility “The AquaCove”

Architect: Studio Nine Architects

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek