The Elizabeth TAFE project is situated in the carpark behind the existing TAFE Trade Building. This project comprised of the removal of bitumen car park along with surrounding trees, kerbing and vegetation to make way for the new building.

The project included intensive hydraulic underground services including PH Tanks, Grease Arrestors Water Tanks etc. The building is mainly constructed from precast concrete panels along with concrete blockwork and danpalon cladding. The building has been designed with facilities and provisions for students to practice and train their respective trades including wet areas for showering and a first aid room for treatment in case of an injury.

Client

DPTI

Architect

Nelson Architects

Location

Elizabeth

Project Type

Education

Download case study
Previous

Previous

Next

Next

Thomas More College- New Senior Centre

Architect: Edge Architects

Partek

Myuna Office Development

Architect: Aspex Building Designers

Partek

CARA Head Office Fit Out (South Australian Disability Service Provider)

Architect: DesignInc

Partek

Senex Energy Office Fit Out

Architect: IA Design

Partek

Northpoint Toyota Prospect

Architect: Tesseract International

Partek

West Beach Parks Resort, Aquatic Facility “The AquaCove”

Architect: Studio Nine Architects

Partek

St Michael’s College Senior Learning Centre & Maintenance Building

Architect: Edge Architects

Partek

Heathfield High School

Architect: DesignInc

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all