Partek were engaged by CARA to undertake the fit out works to their new Hindmarsh offices. With a critical completion date in mind for the office changeover, Partek were engaged as a Managing Contractor to work collaboratively with the client and consultant team to ensure the compressed programme could be achieved.

Soon after project inception, it was paramount the construction works were expediated and consequently, Partek worked closely with Lucid and DesignInc to complete an early works demolition package. This allowed for the design to be finalised and costed accordingly. After providing additional value management to assist the overall project budget, subcontractors and suppliers were engaged efficiently to ensure supply items were procured in advance.

Housing approximately 120 staff, the new fit out encompassed open plan workstation arrangements with print hubs, meeting and quiet rooms, tea points, breakout areas, and a large kitchen across two levels. The new space incorporates a high level of detail and finish, with bold feature ceilings, polished concrete flooring, and feature wall panelling, together providing an impeccable transition between work areas.

Partek worked closely with CARA’s staff throughout the duration of the project. This close collaboration allowed for new space to be frequented throughout the construction works permitting a smooth transition upon completion. We are thankful to have been given the opportunity to assist CARA on this momentus transition and wish them the best of luck in their space in the future.

Client

CARA

Architect

DesignInc

Previous

Previous

Next

Next

Thomas More College- New Senior Centre

Architect: Edge Architects

Partek

Myuna Office Development

Architect: Aspex Building Designers

Partek

CARA Head Office Fit Out (South Australian Disability Service Provider)

Architect: DesignInc

Partek

Senex Energy Office Fit Out

Architect: IA Design

Partek

Northpoint Toyota Prospect

Architect: Tesseract International

Partek

West Beach Parks Resort, Aquatic Facility “The AquaCove”

Architect: Studio Nine Architects

Partek

St Michael’s College Senior Learning Centre & Maintenance Building

Architect: Edge Architects

Partek

Heathfield High School

Architect: DesignInc

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek