West Beach Aged Care Facility

Partek had to be mindful of existing residents and approaching aircraft when working on an extension to the West Beach Aged Care facility near Adelaide Airport.

The 20-bedroom, two-storey centre was built to match the original award-winning facility and included a separate training room within the existing occupied area.

Late design changes and an upgrade to the finishes during construction required a high level of flexibility by Partek to complete the project on time and to the highest standards.

Work was also scheduled to create minimal impact for residents and involved close consultation with Adelaide Airport on the height and use of cranes.

Client

Southern Cross Care

Architect

Comcorp Architects

Location

West Beach

Project Type

Medical and Aged Care

Download case study
Previous

Previous

Next

Next

My Budget Fitout

Architect: Hodgkison Architects

Partek

SA Care ‘The Gums’ Salisbury

Architect: Brown Falconer

Partek

Salvation Army Gawler

Architect: Hodgkison Architects

Partek

Moore Stephens Fitout Adelaide

Architect: Design Inc.

Partek

Redarc Expansion Stage 1 Works

Architect: Christopher Parker Architects

Partek

Seymour College Learning & Innovation Centre

Architect: Swanbury Penglase

Partek

CHG Development Mile End

Architect: Edge Architects

Partek

St Michael’s College Senior Learning Centre & Maintenance Building

Architect: Edge Architects

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek