Partek

Stillwell Select

The reception fitout and new boardroom for Stillwell Select’s Gawler Place office in Adelaide was carried out to exacting standards and specifications.

The design and materials were high-end with quality finishes and meticulous attention to detail. A range of skilled trades people were required to complete the project which started with the demolition of existing facilities and included mechanical, electrical, hydraulic, joinery, specialist floor coverings, aluminum, glass and applied film.

Despite the tight timeframe and budget constraints – and the challenges of conducting the work in a functioning office – the fitout fulfilled the high aspirations of the client.

Client

Stillwell Select

Architect

Woodhead International

Location

Adelaide

Project Type

Fitout

Previous

Previous

Next

Next

CHG Development Mile End

Architect: Edge Architects

Partek

Mount Carmel College

Architect: Edge Architects

Partek

West Beach Parks Aquatic Facility

Architect: Studio Nine Architects

Partek

Heathfield High School

Architect: DesignInc

Partek

SA Care ‘The Gums’ Salisbury

Architect: Brown Falconer

Partek

Salvation Army Gawler

Architect: Hodgkison Architects

Partek

Moore Stephens Fitout Adelaide

Architect: Design Inc.

Partek

Redarc Expansion Stage 1 Works

Architect: Christopher Parker Architects

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek