The Early Learning Facility Project for Seymour College comprised of alterations of an existing building and the construction of a large extension. Construction of the building included a large civil package, structural steel, Aramax ceiling and roofing, a combination of timber and light steel framing, external grade aluminium windows and roller doors, and CFC to the facade. Fit out comprised of lined walls and ceilings painted, joinery selections, tiling, acoustic treated walls, carpets and vinyls.

Upgrading of the school’s site services were also included in this project. Partek worked with Seymour College to ensure the existing building remained in operation and the school were able to upgrade to their services without compromising their day to day activities.

Client

Seymour College

Architect

Flightpath Architects

Location

Glen Osmond

Project Type

Education

Download case study
Previous

Previous

Next

Next

CHG Development Mile End

Architect: Edge Architects

Partek

Mount Carmel College

Architect: Edge Architects

Partek

West Beach Parks Aquatic Facility

Architect: Studio Nine Architects

Partek

Heathfield High School

Architect: DesignInc

Partek

SA Care ‘The Gums’ Salisbury

Architect: Brown Falconer

Partek

Salvation Army Gawler

Architect: Hodgkison Architects

Partek

Moore Stephens Fitout Adelaide

Architect: Design Inc.

Partek

Redarc Expansion Stage 1 Works

Architect: Christopher Parker Architects

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek