Elizabeth TAFE – Feeder Development

The Elizabeth TAFE project is situated in the carpark behind the existing TAFE Trade Building. This project comprised of the removal of bitumen car park along with surrounding trees, kerbing and vegetation to make way for the new building.

The project included intensive hydraulic underground services including PH Tanks, Grease Arrestors Water Tanks etc. The building is mainly constructed from precast concrete panels along with concrete blockwork and danpalon cladding. The building has been designed with facilities and provisions for students to practice and train their respective trades including wet areas for showering and a first aid room for treatment in case of an injury.

Client

DPTI

Architect

Nelson Architects

Location

Elizabeth

Project Type

Education

Download case study
Previous

Previous

Next

Next

My Budget Fitout

Architect: Hodgkison Architects

Partek

SA Care ‘The Gums’ Salisbury

Architect: Brown Falconer

Partek

Salvation Army Gawler

Architect: Hodgkison Architects

Partek

Moore Stephens Fitout Adelaide

Architect: Design Inc.

Partek

Redarc Expansion Stage 1 Works

Architect: Christopher Parker Architects

Partek

Seymour College Learning & Innovation Centre

Architect: Swanbury Penglase

Partek

CHG Development Mile End

Architect: Edge Architects

Partek

St Michael’s College Senior Learning Centre & Maintenance Building

Architect: Edge Architects

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek