Del Monte Palace Apartments

The refurbishment of the Del Monte Palace Building formerly the Australian Institute of Sport Building involved converting the site into 12 Apartments complimented with a central courtyard area comprising Pool, Sauna, BBQ Areas and a Fully licensed Restaurant.The design combined heritage & contemporary materials which required important consultation & liaison from different authorities.

This project was delivered over 60 weeks mainly through 2 summer periods where pedestrian beach goers were most prolific which required segregation & careful logistical planning. Complexities were also encountered due to the client shared under croft car park which Partek gained access.

The interiors consisted of various selections of contemporary floor finishes; alternative laminates, veneers, stone and 2 pack finishes on furniture; carefully selected wall finishes and various ceiling designs and finishes to accommodate the extensive lighting and air conditioning layout.

The exterior comprised a fully serviced courtyard including a large range of feature walls, screening & fencing to accommodate the pool, gym & bbq area. Landscaped surrounds were complimented with drought resistant plants.

Client

Australasian Property Developments Pty Ltd

Architect

Studio Nine

Location

Henley Beach

Project Type

General Construction

Download case study
Previous

Previous

Next

Next

CHG Development Mile End

Architect: Edge Architects

Partek

Mount Carmel College

Architect: Edge Architects

Partek

West Beach Parks Aquatic Facility

Architect: Studio Nine Architects

Partek

Heathfield High School

Architect: DesignInc

Partek

SA Care ‘The Gums’ Salisbury

Architect: Brown Falconer

Partek

Salvation Army Gawler

Architect: Hodgkison Architects

Partek

Moore Stephens Fitout Adelaide

Architect: Design Inc.

Partek

Redarc Expansion Stage 1 Works

Architect: Christopher Parker Architects

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek