Brighton Secondary School – Performing Arts Centre

The Brighton Secondary School is renowned for its Arts background and was delighted when it was issued a grant to build a State of the Art Performing Arts Theatre. Partek were the successful builder engaged from a select list of builders vying for the project.

Partek were required to fast track the project in order to meet government funding guidelines which created demanding time lines from commencement
to completion. Partek were required to liaise with the School, local Council, DPTI, Consultants and Theatre Specialist on a regular basis ensuring that all their needs were delivered.

The Construction comprised of a mix of precast concrete and steel framework clad in various types of materials, which required attention to detail to provide a quality finish. The interior required high level acoustic, cooling, heating, lighting and audio visual necessities which are generally required for such a building.

The performing Arts Centre was complimented with an Amphitheatre and landscaped area to the front which created additional functionality for the users.

Client

Brighton Secondary School

Architect

Kilpatrick Architecture

Location

Brighton

Project Type

Education

Download case study
Previous

Previous

Next

Next

Moore Stephens Fitout Adelaide

Architect: Design Inc.

Partek

Redarc Expansion Stage 1 Works

Architect: Christopher Parker Architects

Partek

Seymour College Learning & Innovation Centre

Architect: Swanbury Penglase

Partek

CHG Development Mile End

Architect: Edge Architects

Partek

St Michael’s College Senior Learning Centre & Maintenance Building

Architect: Edge Architects

Partek

Chiton Rocks Surf Life Saving Redevelopment

Architect: Intro Design

Partek

Investigator College Senior School Building

Architect: Flight Path Architects

Partek

Solitare Automotive Audi Terminal Building

Architect: Walter Brooke Architects

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek