Partek

BAE Systems Infill Building

The BAE infill building was built to provide two existing office buildings totaling 3700m2 with amenities. The area consisted of male & female toilets and change rooms, two disabled toilets, cleaners room and a large open common area. It also was built to link the two existing office buildings together. The infill building was also designed and built in a way to cater for future expansion which will include meeting rooms, office and further amenities.

Client

BAE Systems Australia

Architect

DesignInc Architects

Location

Edinburgh Parks

Project Type

General Construction

Previous

Previous

Next

Next

CARA Head Office Fit Out (South Australian Disability Service Provider)

Architect: DesignInc

Partek

Senex Energy Office Fit Out

Architect: IA Design

Partek

Northpoint Toyota Prospect

Architect: Tesseract International

Partek

West Beach Parks Resort, Aquatic Facility “The AquaCove”

Architect: Studio Nine Architects

Partek

St Michael’s College Senior Learning Centre & Maintenance Building

Architect: Edge Architects

Partek

Heathfield High School

Architect: DesignInc

Partek

SA Care ‘The Gums’ Salisbury

Architect: Brown Falconer

Partek

First Church of Christ Scientist Fitout

Architect: Cheesman Architects

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek