Partek

Adelaide Shores Pool Upgrade

This project comprised of the Demolition of two existing swimming pools and associated paths, vegetation and plant room structure. The new construction consists of one new free form lagoon type swimming pool which will be complimented with new decking, viewing areas, safety fencing and associated plant room to house all the pool equipment. Above the pool are newly erected shade sails & lighting which will accommodate the new design. The pool concourse comprised a high level of exposed aggregate concrete finish to accommodate the new contemporary feel. In conjunction with FMG, Partek worked closely to ensure Inspection Test Plans were adhered to closely to ensure both the infrastructure, quality & operations of the new facility were not compromised & met the level required to deliver a high end product a project of this nature entails.

As the Caravan Park was occupied, Partek worked closely with Adelaide Shores to ensure noise levels were continually programmed & monitored whilst maintaining & not compromising the very stringent program set out to complete works prior to the busy summer months. Partek maintained a high level of safety management with the requirement of large vehicular access entering the site with particular emphasis during holiday periods where the park had a high volume of residence & children.

Client

DPTI

Architect

Grieve Gillett

Location

West Beach

Project Type

General Construction

Previous

Previous

Next

Next

CHG Development Mile End

Architect: Edge Architects

Partek

Mount Carmel College

Architect: Edge Architects

Partek

West Beach Parks Aquatic Facility

Architect: Studio Nine Architects

Partek

Heathfield High School

Architect: DesignInc

Partek

SA Care ‘The Gums’ Salisbury

Architect: Brown Falconer

Partek

Salvation Army Gawler

Architect: Hodgkison Architects

Partek

Moore Stephens Fitout Adelaide

Architect: Design Inc.

Partek

Redarc Expansion Stage 1 Works

Architect: Christopher Parker Architects

Partek

Testimonials

“The attention to detail and the flexibility across the project was evident as no challenge along the way was too difficult to overcome. Overall the final product was first class, the project was completed on time and on budget.”

Peter McCabe
Business Manager Operations, Sacred Heart College

View all

Contact

  • This field is for validation purposes and should be left unchanged.
Partek

169 - 177 South Road
Mile End SA 5031

P 08 8351 7633
F 08 8351 7644

Partek